Nuie 1600mm Right Hand Square Shower Bath
£ 582.00
Authorities in our business will tell in no uncertain terms that Lorem Ipsum is that huge, huge no no to forswear forever. Not so fast, I'd say, there are some redeeming factors in favor of greeking text, as its use is merely the symptom of a worse problem to take into consideration.
Anyway, you still use Lorem Ipsum and rightly so, as it will always have a place in the web workers toolbox, as things happen, not always the way you like it, not always in the preferred order.
Product details
| Dimensions | 160 × 85 × 39 cm |
|---|---|
| Size | 85 x 39 x 160cm |
Description
Suitable for use with a bath screen to create a shower enclosure, a perfect space saving option. Designed and built to the highest quality. Sanitary Grade Acrylic. Un-drilled. Supplied with leg set. Bath panels sold separately.
– Product Weight: 23.0000 kg
– Product Height: 390 mm
– Product Width: 850 mm
– Product Length: 1600 mm
– Seat Included: No
– Number of Tap Holes: 0
– Waste Included: No
– Slip Resistant: No
– Displaced Capacity: 130 l
– Volume: 200 l
– Bath Panel Included: No
– Legs Included: Yes
– Shipping Load Type: Multi Carton

Reviews
Clear filtersThere are no reviews yet.