Nuie 1600mm Left Hand Square Shower Bath
£ 582.00
FREE Standard Delivery
Over £499 to UK mainland
Standard Delivery
£6.95 for 2-7 working days
Next Day Delivery
£9.95 for delivery on Monday
Note:
Delivery cost and availability are calculated using your postcode and the size and weight of the products in your basket. Oversized and pallet-delivered items may require an arranged delivery date.
Additional Note:
You may notify us of most unwanted returns within 14 days of delivery. Products must be unused and returned in resalable condition. Bespoke, installed or hygiene-sensitive products may be subject to exclusions. See our Returns Policy for full details.
Product details
| Weight | 25.5 kg |
|---|---|
| Dimensions | 160 × 85 × 39 cm |
| Size | 85 x 39 x 160cm |
Description
Suitable for use with a bath screen to create a shower enclosure, a perfect space saving option. Designed and built to the highest quality. Sanitary Grade Acrylic. Un-drilled. Supplied with leg set. Bath panels sold separately.
– Product Weight: 23.0000 kg
– Product Height: 390 mm
– Product Width: 850 mm
– Product Length: 1600 mm
– Seat Included: No
– Number of Tap Holes: 0
– Waste Included: No
– Slip Resistant: No
– Displaced Capacity: 130 l
– Volume: 200 l
– Bath Panel Included: No
– Legs Included: Yes
– Shipping Load Type: Multi Carton

Reviews
Clear filtersThere are no reviews yet.