Home » Shop » Nuie 1700 sq showerbath front panel cw fixing

Nuie 1700 sq showerbath front panel cw fixing

SKU: WBS300

£ 154.00

Delivery & Returns
  • FREE Standard Delivery

    Over £499 to UK mainland

  • Standard Delivery

    £6.95 for 2-7 working days

  • Next Day Delivery

    £9.95 for delivery on Monday

Note:

Delivery cost and availability are calculated using your postcode and the size and weight of the products in your basket. Oversized and pallet-delivered items may require an arranged delivery date.

Additional Note:

You may notify us of most unwanted returns within 14 days of delivery. Products must be unused and returned in resalable condition. Bespoke, installed or hygiene-sensitive products may be subject to exclusions. See our Returns Policy for full details.

Product details

Weight3.4 kg
Dimensions170 × 50 cm
Size170 x 50cm

Description

High gloss white Acrylic panel. For use with square shower baths. Coordinating bath front panel also available

– Product Weight: 3.4000 kg
– Product Height: 500 mm
– Product Width: 1700 mm
– Product Depth: 150 mm
– Packaged Weight: 3.4000 kg
– Packaging Length: 47.0000 mm
– Packaging Width: 1015.0000 mm
– Packaging Height: 555.0000 mm
– Shipping Load Type: Standard Parcel

Customer Reviews

0 reviews
0
0
0
0
0

There are no reviews yet.

Be the first to review “Nuie 1700 sq showerbath front panel cw fixing”

Your email address will not be published. Required fields are marked *

Current Item

Nuie 1700 sq showerbath front panel cw fixing

£ 154.00