Nuie 1600mm square showerbath front panel
£ 154.00
Authorities in our business will tell in no uncertain terms that Lorem Ipsum is that huge, huge no no to forswear forever. Not so fast, I'd say, there are some redeeming factors in favor of greeking text, as its use is merely the symptom of a worse problem to take into consideration.
Anyway, you still use Lorem Ipsum and rightly so, as it will always have a place in the web workers toolbox, as things happen, not always the way you like it, not always in the preferred order.
Product details
| Weight | 3.6 kg |
|---|---|
| Dimensions | 160 × 50 cm |
| Size | 160 x 50cm |
Description
High gloss white Acrylic panel. For use with square shower baths. Coordinating bath end panel also available.
– Product Weight: 3.6000 kg
– Product Height: 500 mm
– Product Width: 1600 mm
– Product Depth: 167 mm
– Packaged Weight: 3.6000 kg
– Packaging Length: 1620.0000 mm
– Packaging Width: 530.0000 mm
– Packaging Height: 45.0000 mm
– Shipping Load Type: Standard Parcel

Reviews
Clear filtersThere are no reviews yet.