Nuie 1500mm Left Hand Square Shower Bath

SKU: WBS1585L

£ 582.00

Delivery & Returns
  • FREE Standard Delivery

    Over £499 to UK mainland

  • Standard Delivery

    £6.95 for 2-7 working days

  • Next Day Delivery

    £9.95 for delivery on Monday

Note:

Delivery cost and availability are calculated using your postcode and the size and weight of the products in your basket. Oversized and pallet-delivered items may require an arranged delivery date.

Additional Note:

You may notify us of most unwanted returns within 14 days of delivery. Products must be unused and returned in resalable condition. Bespoke, installed or hygiene-sensitive products may be subject to exclusions. See our Returns Policy for full details.

Product details

Weight27.0 kg
Dimensions150 × 85 × 39 cm
Size85 x 39 x 150cm

Description

Suitable for use with a bath screen to create a shower enclosure, a perfect space saving option. Designed and built to the highest quality. Sanitary Grade Acrylic. Un-drilled. Supplied with leg set. Bath panels sold separately.

– Product Weight: 23.0000 kg
– Product Height: 390 mm
– Product Width: 850 mm
– Product Depth: 390 mm
– Product Length: 1500 mm
– Seat Included: No
– Number of Tap Holes: 0
– Waste Included: No
– Slip Resistant: No
– Displaced Capacity: 130 l
– Volume: 200 l
– Bath Panel Included: No
– Legs Included: Yes
– Shipping Load Type: Multi Carton

Customer Reviews

0 reviews
0
0
0
0
0

There are no reviews yet.

Be the first to review “Nuie 1500mm Left Hand Square Shower Bath”

Your email address will not be published. Required fields are marked *

Current Item

Nuie 1500mm Left Hand Square Shower Bath

£ 582.00